Service
Groundworks, drainage & site works
Site clearance, foundations, drainage, soakaways, ducting and reinforced slabs. Machines owned outright and operated by us, so the dig isn’t waiting on a hire yard.
Groundworks is where a job is won or lost. Everything above it inherits whatever you set out, and mistakes made below ground are the most expensive ones to go back and fix.
What we do
- Site clearance, topsoil strip, dig and cart away
- Foundation excavation and concrete to engineer's detail
- Rising walls up to damp-proof course level
- Foul and surface water drainage, inspection chambers and connections
- Soakaways, land drainage and attenuation
- Service ducting for water, ESB, gas and communications
- Hardcore, radon barrier, insulation and reinforced concrete slabs
- Yard and agricultural concreting
Foundations
Foundation depth is set by the ground, not by convention. In normal firm subsoil away from trees, a strip foundation is commonly taken to around 900mm below finished ground level to get clear of frost and seasonal movement. In shrinkable clay, near mature trees, in made ground or where an existing foundation has to be matched, that figure can increase substantially. Where an extension abuts an existing house we take the new foundation to at least the depth of the existing so the two don't settle differentially.
Deciding this is the structural engineer's call, and if the trial hole shows something different from what was assumed, we stop and get them back out rather than pressing on.
Drainage
Falls are what make drainage work. Too shallow and solids sit in the pipe; too steep and the water runs away from the solids, which has the same result. Foul drainage in 100mm pipe is commonly laid to around a 1:40 fall, with 150mm laid shallower. We bed and surround in the specified material, set inspection chambers at changes of direction, and air-test before backfilling.
Surface water is kept entirely separate from foul. Where there's no public surface water connection, that means a soakaway sized for the roof and paved area draining into it, sited a safe distance from foundations.
Floor slabs
| Layer | Note |
|---|---|
| Hardcore | Placed and compacted in layers, not dumped in one lift |
| Blinding | Sand or quarry dust to protect the membrane above |
| Radon barrier / DPM | Lapped, sealed and dressed up at the perimeter |
| Insulation | To the specified thickness, tight-jointed with perimeter upstand |
| Mesh & concrete | Reinforcement on chairs at the correct cover, slab floated to level |
Our plant
We own our machines rather than hiring them in, which means groundworks don't stall waiting on a hire yard, and there's no hire margin sitting in your price.
| Machine | Weight | Suits |
|---|---|---|
| Doosan DX140LCR | 14 tonne | Foundations, deep drainage, bulk dig, site clearance. Reduced tail swing for close-boundary work. |
| Bobcat mini excavator | 2 tonne | Rear gardens, service trenches, internal digs. Fits through a standard side passage. |
Common questions
How deep do foundations need to go?
It depends entirely on the ground. In firm subsoil away from trees, a strip foundation is commonly around 900mm below finished ground level. Shrinkable clay, mature trees nearby, made ground or a high water table can all require considerably more. Where an extension joins an existing house, the new foundation should go at least as deep as the existing one. The structural engineer sets the depth, and a trial hole before pricing removes most of the guesswork.
Can you get a machine into a rear garden?
Usually. Our 2-tonne mini excavator fits through a standard side passage, and where there's no access at all we can dig by hand or crane a machine over. Access is one of the first things we check on a site visit, because it affects both the programme and the price.
Do you handle the connection to the public sewer?
We carry out the drainage works up to and including the connection, but the connection itself normally requires an application to and approval from Uisce Éireann or the local authority. We can advise on what's needed and coordinate the works around it.
What is a soakaway and do I need one?
A soakaway is an underground void that takes surface water from roofs and paving and lets it percolate into the ground. You need one where there's no public surface water sewer to connect to. It has to be sized for the area draining into it and sited a safe distance from foundations, and it needs suitable ground to work at all.
Do you do percolation testing for wastewater systems?
We carry out site characterisation trial holes and percolation testing as part of groundworks for on-site wastewater systems, in line with the relevant EPA code of practice. Where a full site characterisation report is required for a planning application, that is normally produced by a qualified assessor.
Next step
Get a price on your job
Send us the address, what you're planning and any drawings you have. We'll come back with a realistic range before anyone spends time on a site visit.